Quantcast
Home manage Las Vegas Review-Journal
  Jobs Cars Homes Shopping Travel Weddings Golf Best of Las Vegas Photo   Search:

RECENT EDITIONS
Sat Sun Mon Tue Wed Thu Fri

sponsored by
News


BLACK CANYON SPAN: Crane system on way

Hoover Dam bypass completion not expected until '10

A crane system needed to construct the Hoover Dam bypass bridge across Black Canyon should be up and running this month, a federal official said.

The new pulley-type, "high-line" crane system was designed and specifically built with the bypass project in mind, said Dave Zanetell, a Federal Highway Administration engineer overseeing the project. "The other system was basically brought in from another construction site."


Most Popular Stories
  • NORM: Terry Fator, wife ending marriage
  • NORM: Blaze breaks out during magic act
  • NORM: Jackson worked on album at Palms
  • Ex-Ensign aide details wife's affair
  • NORM: Jacksons set up LV memorial area
  • SENATOR'S AFFAIR: Hamptons given $96,000 in gifts
  • LV area residential real estate sales reach record in June
  • Ensign wrote lover a letter, saying their affair was a 'sin'
  • Coroner says sexual assault suspect killed by police was shot in back
  • Official: Fatal gunshot in back




  • More than a year ago, two pairs of 280-foot towers that made up the other system collapsed amid 55 mph winds.

    The high-line system is needed to carry up to 50 tons of materials and workers about 1,100 feet over the Colorado River via 2,300-foot-long steel cables that stretch between the towers and over the gorge.

    At first, project officials hoped the collapse would delay the $240 million bridge project by only six months.

    Officials think the project won't be finished until mid-2010 at the earliest. The bridge was supposed to have been completed by the end of 2008.

    The primary contractors, a multinational conglomerate made up of the Obayashi Corp. and PSM Construction USA Inc., will have to absorb the cost of rebuilding the crane system, Zanetell said.

    "The price of the project to the government remains unchanged," he said.

    In the meantime, work has been progressing with the use of more conventional derrick cranes.

    And recently, Zanetell said, a contract was awarded for the final paving work to be done on the approach roads on both sides of the bridge.

    The 1,905-foot bridge will include an 890-foot span over the river. It will provide four lanes for the U.S. Highway 93 traffic that currently uses the two-lane road over the dam.

    About 17,000 cars and trucks are expected to use the new bridge on a daily basis.

    Today more than 2,000 trucks detour the dam via U.S. Highway 95 to a river crossing in Laughlin. Truck traffic was banned from the dam just after the terrorist attacks of Sept. 11, 2001.

    The new structure will be named the Mike O'Callaghan-Pat Tillman Memorial Bridge. O'Callaghan was a popular two-term governor of Nevada, and Tillman was a patriotic Arizona Cardinals football star who joined the military after the 2001 attacks and was killed accidentally by his fellow U.S. soldiers in Afghanistan.

    Beyond the new crane being installed, Zanetell is looking forward to six months from now when all systems are go.

    "In June, there won't be a day that goes by where the work we'll be doing won't be either the first time it's ever been done or it won't be the biggest it's ever been done."

    Contact reporter Francis McCabe at fmccabe@reviewjournal.com or (702) 387-2904.

    Newsvine Digg Fark Technorati reddit StumbleUpon del.icio.us Slashdot Propeller Mixx Furl Twitter MySpace Facebook Google Bookmarks Yahoo! Bookmarks Windows Live Favorites Ask MyStuff myAOL Favorites

    Leave Your Comment 4 Reader Comments
    Terms & Conditions
    The following comments are provided by readers and are the sole responsiblity of the authors. The reviewjournal.com does not review comments before publication nor guarantee their accuracy. By publishing a comment here you agree to abide by the comment policy. If you see a comment that violates the policy, please notify the web editor.

    Some comments may not display immediately due to an automatic filter. These comments will be reviewed within 48 hours. Please do not submit a comment more than once.
    Current Word Count:

    Note: Comments made by reporters and editors of the Las Vegas Review-Journal are presented with a yellow background.

    RussBBinVegas@aol.com wrote on January 07, 2008 01:35 PM: I love how this reporter just casually throws in that Pat Tillman was killed "accidentally" by his fellow American soldiers in Afghanistan. Anyone following the case of Tillman's death knows there are many unanswered questions, and that it is far from certain how this glorious hero, who was used as a propaganda tool by our government, acutally died.


    Tom, Burbank wrote on January 07, 2008 09:43 AM: The entire Hoover Dam was built 70 years ago at budget and on time, by a group of Americans and without the assistance of computers. This multinational conglomerate group can't even build a bridge. Only 4 lanes? So much for forward thinking. And that name? NO ONE is going to spend the time to call it by that overly long moniker. But I'm sure the people who came up with it have all patted themselves on the back for their wonderful inclusiveness. Bah.


    Eddie wrote on January 07, 2008 07:45 AM: Yeh, a tunnel. Can you say "Big Dig?" Union craftsman would have a field day building a tunnel under the Colorado.


    Jerome King wrote on January 07, 2008 06:56 AM: Why didn't they simply build a tunnel under the river and save all that beauty?